Wednesday, February 20, 2019

Modeling and Simulation of Wind Turbine System

Chapter 5Modeling and Simulation of revoke Turbine SystemSTANDALONE WIND goose egg SYSTEMSize OF WIND SYSTEM COMPONENTSThe sizing methodological analysis adopted for the bing lift advocator brass for the sm al adept town Umrikheda is explained consistently as follows figuring of electric agitateThe warhead of small town Umrikheda 150 kWh/day arouse be ope grazed by the proposed base correctly weave brawn governance. The lucubrate size of it methodological analysis adopted for day-to-day galvanizing burden of the distant small town Umrikheda which is operated by the return WIND transcription is given in under control panel 5.1.Table 5.1 Electrical burden of small town UmrikhedaS. nary(prenominal) muscularity ingestion ( Wh/day )1Families98,5002Street illuming15,8003School26,5004Others9200Entire150 kWh/dayThe wide-cut day-to-day electric burden of the small townThe designed burden for the give vent underway zilch form must be higher than the stallion galvanis ing burden of the location because at the primp of operation burden fluctuations and tycoon losingss are occurs in the way menstruum turbine constitution.The designed burden for the circulate flow turbine remainsFrom compare ( 5.2 ) the day-to-day electrical ingestion for planing of stress contemporary turbine energy carcass is obtained as 225 kWh/day. The factor 1.5 is known as Fudge factor. This accounts for efficiency losingss, wiring and inter connectedness losingss and besides the electric battery charging and discharging losingss in the WES constituents.size of air on-line(prenominal) turbineThe selected air current turbine must fit the air current features at the site and it should bring forth optimal energy with a high mental ability factor ( CF ) to run into the electrical energy demand. The Turbine size is immovable utilizing Eq. ( 5.4 ) . Based on the major military unit equation of air current turbine the diameter of turbine is considered 18 m so that t he move state of the air current turbine for the bing power system is obtained with the usage of diameter. The power equation for air and turbine are given as follows.Where ? is the air niggardliness and its look on is 1.225, CPhosphorusis power coefficient with changeless set 0.59, A is the swept country of the selected air current turbine and V is the call up hourly air current velocity of the location which is 4.5 m/sec. based on Eq. ( 5.4 ) the power of cardinal air current turbine is obtained as 8.38 kilowatt. The consummate get wind of wind turbine requisite to carry through the load demand of the location is 27 turbines individually of 8.38 kilowatt capacities.Sizing of battery intrustThe battery assert size in kW hr asshole be determined by the Eq. ( 5.5 ) . For bettering life of battery and for back-to-back cloudy yearss the fig of autonomy yearss is considered as 3 yearss in the proposed air current power system. The deep cycling will be occasional during n ebulose yearss and therefore better the battery life. The three yearss of indecorum was used by zero energy visitants centre ( ZEVC ) located at the Van Ness Campus of University of the District of Columbia as reported in 2006 by the Center of Excellence for Renewable Energy ( CERE ) 7 .Battery savings bank SizeHere the figure of autonomy yearss is considered 3 yearss and the maximal deepness of discharge for the battery bank is interpreted 75 % . The size of battery bank is 900 kWh mensural by Eq. ( 5.5 ) . might of battery bankThe capacity of the battery bank in ampere-hours rotter be evaluated by spliting the ripe energy storage required by the DC electromotive force of genius battery as shown in Eq. ( 5.6 ) . In the bing system we have elect the evaluation of battery is 12 V and 350 Ah.Harmonizing to the obtained capacity of the battery bank from Eq. ( 5.6 ) , an another(prenominal) determination has to be made sing the capacity of each(prenominal) of the batteries of th at bank. The battery bank is composed of batteries that are connected in series and in parallel harmonizing to the selected battery electromotive force evaluation and the system demands.Number of batteriesThe entire figure of batteries is obtained by spliting the capacity C of the battery bank in ampere-hours by the capacity of one of the battery selected in ampere-hours which is cipher by Eq. ( 5.7 ) .The figure of batteries required for the system is obtained from the Eq. ( 5.7 ) is 214.28 which is rounded to 216 batteries. The connexion of batteries can liberal be figured bulge out by happening out the figure of series and parallel affiliated batteries. With system DC-voltage of 48 V, the figure of batteries connected in series is obtained by Eq. ( 5.8 ) .The figure of series connected batteries is determined by Eq. ( 5.8 ) which is 4. With the usage of this take to be we can cipher the batteries connected in analogue or the figure of set up by Eq. ( 5.9 ) which is as follo ws.No. of set up ( batteries connected in analogue )The figure of parallel strings of four series connected batteries is determined by Eq. ( 5.9 ) . The entire figure of batteries is 216 which can be arranged in 54 parallel strings and each of the twine consists of 4 series connected batteries. The Ah capacity of battery bank gets added when batteries are connected in analogue and remains corresponding when batteries are connected in series.Converter sizingThe convertor size is chosen as it fulfills the burden demand when the system is non runing. The dc electromotive force of the bing system is 48 V so the convertor must be chosen which takes the Ac end product from the air current turbine and change all over it into 48 V District of Columbia. The evaluation of convertor should neer be refuse than the system evaluation, it is ever 10 % higher than the system evaluation. The size of convertor for the testify system can be calculated by Eq. ( 5.10 ) .The mean power of the contr aptions that may run at the same time at the same jog is taken as 40 kilowatt. So the requisite convertor must be capable of managing 40 kilowatt. embody OF SYSTEM COMPONENTS toll of turbineTurbine is habitation of four chief constituents as Blades, Hub, nose cone and tower. The hail of all these constituents is sums up for finding the entire constitute of air current turbine. The below look shows the entire monetary value of turbine as follows.In the present scan we have used WES 5 Tulipo type air current turbine. The bell of one air current turbine is a? 51000 and the entire represent of air current turbine is obtained as a? 1,377,000.Cost of battery bankThe hail of battery bank can be calculated on the footing of existent size of the battery bank. Cost of battery bank can be calculated by the Eq. ( 5.12 ) . The apostrophize of one battery bank is multiplied by the entire figure of batteries to cipher the coat of battery bank.The cost of one battery of bank is a? 13000 a s reported by SECO 6 and besides reported in website 13 .Cost of convertorThe cost of convertor can be calculated by below Eq. ( 5.13 )The cost of convertor determined by Eq. ( 13 ) is a? 178479824.Capital investment funds cost of air current energy system ( CO)The dandy cost of air current power system includes the construction cost and the cost of land used for the system. In the present survey the land required for puting air current turbines and batteries is 5000 pess2. Cost of land in the proposed small town Umrikheda is 555.5 Rs/feet2. So, the entire monetary value of land is a? . 2,800,000 approximate. The capital of the United States investing cost of the air current system is calculated by below Eq. ( 5.14 ) .The balance of system or construction cost is about 20 % of the entire air current system constituent cost which is widely assumed all over the universe as reported by SECO 6 Besides, assume that cost of securing the land for the air current energy system is 20 % of the entire air current system component cost. Based on these premises, the capital cost ( CO) for the air current system is determined utilizing above trust weight. ( 5.14 ) .Operating and care cost of the systemThe operating and care cost for the proposed system is 2 % of the capital cost of the system. The computation of the operating and care cost is as given by Eq. ( 5.15 )The operating and care cost of is added to the capital investing cost of the system to happen out the special cost of the system. So, the modified capital investing cost of the system is a? 10,734,233.24 with the usage of Eqs. ( 5.14 ) and ( 5.15 ) .LIFE CYCLE COST ANALYSIS FOR WT SYSTEMReplacement cost of battery bank systemIn the present Wind energy system the life of air current turbine and the battery is considered as 30 previous(a) ages and 5 ears severally and the life pulse cost analysis is based on the life clip of both the turbine and the battery. The subsidised involvement rate usually off ered by authorities sectors in India to patterned advance the usage of renewable energy applications is 4 % . So, we have taken the rate of involvement is 4 % for our system. In India the old batteries are replaced on the discount of 7 % on entire cost of battery. With the premise of invariable replacing of battery throughout the life of the system the replacing cost of battery bank after 5 old ages is calculated by Eq. ( 5.16 )In the present system the replacing cost of batteries is obtained as a? 2611440.Present Battery bank costThe present cost of battery bank for proximo investings at every five old ages interval can be determined by combining weight. ( 5.17 ) as follows( 5.17 )The present battery bank cost is obtained as a? 7547648.06 with 4 % involvement rate. 4 % is the subsidised involvement rate usually offered by authorities sectors in India to advance the usage of renewable energy applications. In this life rhythm cost analysis the remedy value ( S ) of WT system at t he lowest of 30 old ages life was assumed equal to the present cost of balance of system since the depreciation of balance of system was considered tantamount to the rate of escalation in the monetary value of structural steel per kilogram.Present Salvage value of WT systemThe present salvage value of the system can be calculated by Eq. ( 5.18 )Net Present cost of WT systemNet present cost of WT system ( CInternet) is determined as summing up of capital investing ( CO) , all other cost constituents converted into present cost and subtracted by present salvage value. The net present cost of PV system was determined utilizing Eq. ( 5.19 ) as followsAnnualized Lifecycle Cost of WT systemThe annualized life rhythm cost of WT power system over the 30 old ages lifetime is expressed mathematically utilizing Eq. ( 5.20 ) 14 as followsCapacity use factor ( CUF )The capacity use factor can be calculated by the following(prenominal) Eq. ( 5.21 ) . The CUF is calculated to ease the unit cost of electrical energy.The CUF is obtained by the above Eq. which is basically a step of electrical energy generated per KW of installed capacity per twelvemonth.Capital recovery factor ( CRF )The below Eq. ( 5.22 ) shows the look of capital recovery factor. It is used to find the sum of each hereafter rente payment required to roll up a given present value for known values of involvement rates and figure of payments.4 % is the subsidised involvement rate usually offered by authorities sectors in India to advance the usage of renewable energy applications.Unit of measurement cost of electricity ( UCE )Using the capacity use factor the unit cost of electricity can be calculated by below Eq. ( 5.23 ) .Where COis the capital cost, m is the ingredient of capital cost used on operation and care of the system and P is the capacity of the air current power coevals system.Payback periodThe EPBT signifies clip period required by energy output for counterbalancing the energy investings on th e Stand Alone Wind Turbine power works. The energy retribution clip for the bing SAWT system installed on steel construction over the land get on can be calculated based on the below Eq. ( 5.24 ) .The payback period for the proposed Wind Turbine system is calculated as 14.43 old ages with a? 9 Per unit cost of the system running for 30 old ages.Carbon monoxide2EMISSION MITIGATION AND CARBON CREDIT POTENTIAL FROM PROPOSED SAWT SYSTEMThe C citation posture of Wind power system is determined on the footing of entire sum of CO2emanations extenuation from the system in its life clip. The Co2emanation and C recognition potency are given by the below expression.Co2emanation rationalize from WT systemConversion of Energy through Wind Turbine ( WT ) system is one of the more dependable and environmental friendly renewable energy engineerings which have the possible to lend significantly in the development of sustainable energy systems for coevals of power. It besides plays an of resul t function in CO2emanations extenuation. To cipher the entire CO2emanations mitigated from the present SAPV power system a mathematical calculation is carried out. The mean strength of CO2emanation from ember thermic power works in India is 1.57 kg/kWh 1, 16 . The entire extenuation of CO2emanations from the bing SAWT system for 30 old ages life can be calculated utilizing Eq. ( 5.25 ) as follows( 5.25 )A air current turbine power system does non disperse immense sum of heat energy into the environing environment and saves a big sum of CO2emanations. Hence, WT systems are eco friendly systems and a good woof for power coevals and must be preferred where electricity is non usable or grid power is costlier.Carbon Credit potency of proposed WT systemThe entire sum of C recognition earned by proposed Wind Turbine power system can be calculated by the undermentioned Eq. ( 5.26 ) as follows.( 5.26 )The factor considered in Eq. ( 5.26 ) is a? 1760/ton of CO2extenuation represents the p ecuniary value of one C recognition for extenuation of 1 ton of CO2emanation 18 .Consequence of C recognition potencyThe CO2emanation extenuation from the bing power system is estimated as 88.31 lashings/year from Eq. ( 5.25 ) for n peers to 1 twelvemonth. The entire CO2emanation mitigated by bing PV system in 30 old ages life clip is estimated utilizing Eq. ( 5.25 ) as 2649.375 dozenss. The C recognition from the bing WT system is obtained utilizing Eqs. ( 5.25 ) and ( 5.26 ) . The C recognition affects the unit cost of electricity produced from non-polluting WT power system.ConsequenceThe life rhythm cost analysis is carried out for the presented standalone Wind Turbine power system and the cardinal consequences obtained are listed in Table 5.4.The unit electricity cost utilizing Wind Turbine systems were estimated as a? 9/kWh for the involvement rate of 4 % , 30 old ages life of WT system and 5 old ages life of battery bank.Table 5.2 Consequences of WT power systemS.No.Compone ntCost ( a? )1Wind Turbine1,377,0002Battery bank2,808,0004Converter1,784,798.45Capital investing10,734,233.246Battery replacing2,611,4407Salvage value3,313,034.958Net nowadays value14,968,882.3591011Unit of measurement cost of electricityCarbon monoxide2emanation mitigatedCarbon recognition earned9/kWh2649375 dozenss or 88.31 scads/yra? 4519833.75 or a? 150661.125/yrThe energy consumed by the burden per twelvemonth was determined as 56250 kWh/year and matching CO2 emanation mitigated is estimated as 88.31 tons/year. The entire CO2 emanation mitigated by bing PV system in 30 old ages life clip was estimated utilizing Eq. ( 5.25 ) as 2649.375 dozenss.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.